• tel: 01480 455 179

Construction nearly complete for new Endoscopy theatre at Spire Cambridge Lea hospital

RHA were appointed by Spire Healthcare to carry out the structural and civil design associated with a significant alteration scheme to provide a new Endoscopy Suite and Day Care ward within the existing hospital. The project includes a new plantroom above the existing building and has utilised B.I.M. and analysis software to allow preparation of efficient and effective design and detailing. Working alongside Redfern ArchitectureLeonard Engineering Design Associates and Collabora Consulting again, the design process has now been completed successfully and construction is almost complete, with main contractor Souness & Boyne set to deliver another succesful project for Spire. 

Enquire Now

Please complete the form below to submit an enquiry to us. We are usually able to respond the next working day.

I am happy for Richard Hermann Associates to keep in touch beyond this enquiry via the following methods:

Our Clients

We have had the privilege of regularly providing our services to the following clients:

© 2015 Richard Herrmann Associates   -   Site by Verto