New Hospital at Tollerton, Nottingham
Client: Spire Healthcare
Value: £26m
In partnership with Architects Halliday Meecham, Richard Herrmann Associates are proud to have provided the structural and civil design associated with a new hospital for long-term client, Spire Healthcare. The construction commenced on-site during the summer of 2015 and was completed in 2017.
The two and three-story hospital provides theatres, diagnostic facilities, wards, and care facilities, along with associated plant rooms and staff accommodation. The hospital’s specialist use requires a deep understanding of the intricate equipment support requirements for items such as medical pendants, theatre extract canopies, MRI and CT scanners, etc.
Theatre floors were designed to meet with strict deflection and vibration criteria, which also needed to integrate with extensive services and the floor, wall, and roof penetrations.
The civil engineering element of the project involved the design and detailing of the access road and car park pavement. The overall site drainage was achieved by utilising an attenuation pond.
If you would like experienced civil structural engineers to spearhead your project, contact us on our Contact Us page or ring the phone number above.